Installation Instructions of Vocal Booth

Step 1: Lay Bottom Piece on Relatively Level Ground

Step 1: Lay Bottom Piece on Relatively Level Ground

Step 2: You will need a second person. Place Back Wall into the slot and lock in “Side Without Window” into the slots as demonstrated

Step 2: You will need a second person. Place Back Wall into the slot and lock in “Side Without Window” into the slots as demonstrated

Step 3: Install Shelf

Step 3: Install Shelf

Step 4: Install “Side with Window”

Step 4: Install “Side with Window”

Step 5: Install Low Mid Trap

Step 5: Install Low Mid Trap

Step 6: Install Front Wall

Step 6: Install Front Wall

Step 7: Install Ceiling

Step 7: Install Ceiling

Step 8: Fix Ceiling in Place

Step 8: Fix Ceiling in Place

Step 9: Plug power lead into the light

Step 9: Plug power lead into the light

Step 10: Screw all walls and shelves in

Step 10: Screw all walls and shelves in

Step 11: Install Fixing angles to the floor and side walls

Step 11: Install Fixing angles to the floor and side walls

Step 12: Should look like this ^

Step 12: Should look like this ^

Step 13: Run Extension lead into hole

Step 13: Run Extension lead into hole

Step 14: Run the lead in the groove on the back of the plate

Step 14: Run the lead in the groove on the back of the plate

Step 15: Screw plate on. Be careful not to pinch power lead

Step 15: Screw plate on. Be careful not to pinch power lead

Step 16: You now have power into the booth. For higher performance, use silicon or sealant to fill around the extension lead

Step 16: You now have power into the booth. For higher performance, use silicon or sealant to fill around the extension lead